Modamkar provides practical and highly
effective solutions to meet specific client requirements and has the
resources to plan and prepare concepts and detailed drawings for the most
complex of integrated systems.
This is supported by a national network of
dedicated Sales Engineers, complemented by our internal Customer Service
teams, responsible for the progressing of customer orders through to
equipment supply, installation, commissioning and after-sales service.
From the simplest two zone conventional
control panel to the most complex interactive digital addressable fire
detection system �amkar ingenuity can be seen at work in major high
street stores, shopping malls, sporting stadiums and a variety of
commercial environments.
Always ahead of the latest market needs,
Modamkar has developed an interactive, digital addressable fire detection
system incorporating discriminating algorithms designed to reduce false
alarms, whilst providing the most reliable fire detection system.
Modamkar has the ability to offer a
岮-keyࡣkage, including conventional, interactive digital
addressable and incipient fire detection systems plus extinguishing and
fire suppression options. Many of the classic design have evolved into the swiss watches second brand logo, such as Rolex case form style, embody the spirit of the original, more than half a century of the test, almost become the rolex watches representative image of the watch. Form (OYSTER), is a great invention of Rolex, the integrated design case, screwed into the bottom cover and the rotary head to replica rolex watch the production process, the overall use of steel cutting car, make the table ear case integration.
This expertise is built on a close working
relationship with our major clients encompassing system design, on-site
installation, commissioning and a full 24 hour on-call maintenance service
from manned centres.
Our Projects Department is responsible for
undertaking installation works either directly for the end user or on
behalf of major electrical contractors. Works are controlled by our
skilled engineering teams based on size, complexity and value.
Our Major Contracts teams are assembled
specifically at given periods to concentrate on particular major projects.
Specialist engineering teams, usually comprising Project Managers,
Installation Supervisors and administration support, operate from both the
Nelson Head Office and our network of regional offices. Typical major
projects include the Bullring Birmingham, Millennium Dome, Hyundai, Former
Royal Yacht Britannia and Haslar Hospital, Southampton.
|